Chuan Yi Construction & Renovation Sdn Bhd
15 April, 2013
Laying works @Bdr Sri D'sara
• Attic floor brickwall.
• New construct staircase.
• 2nd floor brickwall.
08 April, 2013
Structure works @Bdr Sri D'sara
• Car porch extend.
• Staircase construct.
• Attic floor concrete beam and vertical column.
• Ground floor kitchen area brick wall.
22 March, 2013
Attic Floor @Bdr Sri D'sara
• Construct attic floor concrete slab.
• Attic floor ground beam.
• Connect to main brick wall Y-12.
18 March, 2013
Attic floor hacking work @Bdr Sri D'sara
• Hack off existing concrete slab.
• Hack off existing beam and join the new steel.
07 March, 2013
1st Floor @Bdr Sri D'sara
• Vertical column w/ Y-12.
01 March, 2013
Ground floor @Bdr Sri D'sara
• Fill debris in bottom, same level with existing floor.
• Dig sand.
• Construct foundation w/ Y-12 and Y-16
• Fill debris, sand and stone.
• Construct ground beam and slab.
• Fixed model to construct ground beam w/ Y-12.
• Ground beam.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)